Top-Rated ADU Developer in Greater Sacramento

Building affordable ADUs with a focus on quality, energy efficiency and design

Get A Free Estimate

Request a Free, No Obligation Quote and Get A Free 3D ADUs Design Layout

Our Projects

We'll construct your Turnkey custom ADU with a strong focus on quality

The calculations are approximate based on the Big Data

The calculations are approximate and are based on Glad Construction's construction experience.

Total Price

$108,500

S-250 SF

Total Price

$149,600

S-350 SF

Total Price

$189,150

S-450 SF

Search ADU floor plans.

We create custom ADUs tailored to your property's unique features. Whether you want to modify an existing plan, comply with HOA rules, or design something unique, we're here to help. Contact us to explore the possibilities. Our in-house drafting team is ready to make your custom ADU project perfect.

Filter By

Type
Plan type
Bedroom Count
  • All
  • 1 Bedroom
  • 2 Bedrooms
Bathroom Count
  • All
  • 1 Bathroom
  • 2+ Bathrooms
Square feet
  • All
  • 250 sq. ft
  • 250 sq. ft - 350 sq. ft
  • 350 sq. ft - 450 sq. ft
  • 450+ sq. ft

5BR/4BA 168×151 H-Shape

Bed

1 Bedroom

Bath

2+ Bathrooms

ft

350 sq. ft - 450 sq. ft

1BR/2BA 68×51 F-Shape

Bed

1 Bedroom

Bath

2+ Bathrooms

ft

450+ sq. ft

2BR/3BA 118×121 G-Shape

Bed

2 Bedrooms

Bath

2+ Bathrooms

ft

250 sq. ft - 350 sq. ft

6BR/6BA 148×131 D-Shape

Bed

1 Bedroom

Bath

1 Bathroom

ft

450+ sq. ft

1BR/3BA 48×31 L-Shape

Bed

1 Bedroom

Bath

1 Bathroom

ft

250 sq. ft

3BR/3BA 48×31 L-Shape

Bed

1 Bedroom

Bath

1 Bathroom

ft

250 sq. ft

Explore More Options

We design modern ADUs to create peaceful sanctuaries for you and your loved ones

Process

Phase 1
$6600

Permit Timeline 2-3 months

Phase 2
$160 000 - $280 000

Timeline for project completion 3-4 months

Phase 1

Comprehensive Land Survey and Site Preparation

Development

Worked hand-in-hand with our architect. Architect will draw up plans with three revisions included.

Approval

Engineer will approve plans and provide details if needed.

Obtaining permits

We will submit all plans for permits.

Completion

Phase two will be completed as soon as Clients receive approved and stamped plans for their project.

*Clients have the right to choose another contractor for phase 2 of their project

Initial Project Outline

CalHFA’s ADU Grant Program — The CalHFA ADU Grant Program provides up to $40,000 in assistance to reimburse homeowners for predevelopment costs necessary to build and occupy an ADU.

New ADU funding laws effective January 1, 2021e

New ADU funding laws effective January 1, 2021

  • The California Health and Safety Code (HSC), Section 65583(c)(7), requires that cities and counties develop a plan that incentivizes and promotes the creation of ADUs that can be offered at affordable rent for very-low to moderate-income households.
  • As recapped below, HCD has developed a list of existing state grants and financial incentives in connection with the expenses for the planning, construction and operation of an ADU with affordable rent for very low to moderate- income households.
    • Potential State Grants and Financial Incentives for ADUs
      • CalHome Program — State funds to local public agencies and nonprofit corporations for first-time homebuyer mortgage assistance including a home purchase with an ADU or JADU; owner-occupied rehabilitation assistance including rehabilitation of ADUs or JADUs; ADU/JADU assistance including construction, repair, and reconstruction; and homeownership development project loans including predevelopment and carrying costs during construction related to ADUs and JADUs (HCD CalHome program)
      • Local Early Action Planning (LEAP) Grants — State grants to local jurisdictions including eligible partnerships for housing planning, and developing or improving an ADU ordinance in compliance with Section 65852.2 of the Government Code (HCD LEAP program)
      • Local Housing Trust Fund (LHTF) Program — Matching funds to local and regional housing trust funds. Funds may also be used for the construction, conversion, repair, reconstruction or rehabilitation of ADUs or JADUs (HCD LHTF program)
      • Regional Early Action Planning (REAP) Grants — Grants to council of governments (COGs) and other regional entities for activities relating to housing planning and activities including establishing Prohousing Policies such as adopting ADU ordinances or other mechanisms that reduce barriers for property owners to create ADUs (HCD REAP program)
      • SB 2 Planning Grants — Grants to local governments including eligible partnerships for housing planning and to encourage ADUs and other innovative building types through ordinances, outreach, fee waivers, pre-approved plans, website zoning clearance assistance, and other homeowner tools or finance tools (HCD SB2 program)
      • Community Development Block Grant Program (CDBG) — Federal funds allocated to non-entitlement jurisdictions, and non-entitlement jurisdictions that partner with non-federally recognized Native American communities for community development activities including single- and multi-family rehabilitation and potential local ADU rehabilitation and planning programs. Applicants must be income qualified in low- to moderate-income households for rehabilitation and areas for planning. Contact your local jurisdictions for more information.
    • Other Potential Grants and Financial Incentives for ADUs

Phase 2

Accurate Bid provided upon the scope of work per plans

Grading and earthwork

Grading and earthwork

Hook up utilities

Footings and foundation

Framing

Rough electrical and plumbing

HVAC

Roofing siding windows

Drywall, flooring, kitchen, bathrooms, and finishes

Why Work With Us?

We are a professional ADU Contractor based in Sacramento, CA.

Detailed Project Timelines

We provide a comprehensive project timeline before starting, detailing each phase so you know exactly when your ADU will be completed.

No Plans? No Problem

From initial design to obtaining necessary permits, we manage every aspect of your ADU project seamlessly.

Real Times Updates

Stay informed with real-time updates via text messages, informing you of the progress and daily activities of your ADU construction.

Modern Designs & Styles

Our collaboration with skilled designers and architects ensures that your ADU features modern designs that match your vision.

Quality Craftsmanship

We emphasize quality craftsmanship, paying meticulous attention to details to deliver the best results for your ADU.

Fast Turnaround Times

Our team is known for completing projects efficiently and on schedule, ensuring your ADU is ready when you need it.

FAQ Block

Timeline and Process

Extra income, added property value, and flexible living space.

Most residential lots are, but check local zoning laws.

Submit plans, get permits, and pass inspections.

ADUs can significantly increase property value.

Options include home equity loans, construction loans, and grants.

As rental units, guest houses, or for family living.

Zoning laws, construction costs, and utility connections.

Likely increases property taxes, but might offer rental tax benefits.

Typically 6 to 12 months.

Yes, you can live in the ADU and rent out the main house.

Custom or pre-fab, with various styles available.

Filter By

Plan type
Bedroom Count
  • All
  • 1 Bedroom
  • 2 Bedrooms
Bathroom Count
  • All
  • 1 Bathroom
  • 2+ Bathrooms
Square feet
  • All
  • 250 sq. ft
  • 250 sq. ft - 350 sq. ft
  • 350 sq. ft - 450 sq. ft
  • 450+ sq. ft