Phase 1
Land Survey, Testing and Preparation

Phase 2
$12 600

Timeline 6-8 month

Phase 3
$320 000 - $1 200 0000

Timeline for Project completion 5-6 months

Phase 1

Comprehensive Land Survey and Site Preparation

1. Land Survey

Boundary Survey: Commission a professional land survey to clearly define the property boundaries.

2. Soil Testing (Geotechnical Investigation)

Hire a Geotechnical Engineer: Engage a licensed geotechnical engineer to conduct soil tests.

3. Site Clearing and Preparation

Clearing Vegetation: Remove trees, bushes, and any other vegetation from the building area.

4. Access to Utilities

Locate Existing Utilities: Identify the locations of existing utility lines such as water, sewer, electricity, gas.

5. Environmental Assessment

Environmental Impact Study: Conduct an environmental impact assessment if required by local regulations.

6. Site Analysis and Planning

Drainage and Water Management: Plan for site drainage to prevent waterlogging and erosion, including the installation

7. Initial Permitting and Approvals

• Zoning Verification: Confirm that the land is zoned for residential construction and check any zoning restrictions.
• Obtain Permits: Apply for and secure any necessary preliminary permits, such as grading or land disturbance permits.

Phase 2

Architectural Development and Plan Approval

Development

Worked hand-in-hand with our architect. Architect will draw up plans with three revisions included.

Approval

Engineer will approve plans and provide details if needed.

Obtaining permits

We will submit all plans for permits.

Completion

Phase two will be completed as soon as Clients receive approved and stamped plans for their project.

*Clients have the right to choose another contractor for phase 3 of their project

Phase 3

Accurate Bid provided upon the scope of work per plans

Grading and earth work

Hook up utilities

Footings and foundation

Framing

Rough, electrical and plumbing

HVAC

Roofing siding windows

Drywall, flooring, kitchen, bathrooms, and finishes

Why Work With Us?

We are a professional Home Build Contractor based in Sacramento, CA.

Detailed Project Timelines

Before we start your project, we give you a step-by-step project breakdown that shows you exactly when your project will be completed.

No Plans? No Problem

From start to finish, we take care of everything from design to the permitting process and more.

Real Times Updates

Stay informed with real-time updates via text messages, informing you of the progress and daily activities of your Home Build construction.

Modern Designs & Styles

Glad construction works with talented designers and architects to create modern styles that suit your taste.

Quality Craftsmanship

We focus on providing quality craftsmanship by paying special attention to the small details that bring out the best in every project.

Fast Turnaround Times

Our customers recognize us for completing each job quickly and on time without cutting corners.

FAQ Block

Timeline and Process

The timeline for building a home can vary widely depending on the size and complexity of the project, as well as weather conditions and permit approvals. On average, it takes about 6-12 months from start to finish.

The timeline for building a home can vary widely depending on the size and complexity of the project, as well as weather conditions and permit approvals. On average, it takes about 6-12 months from start to finish.

The process involves submitting detailed plans and specifications to your local building authority. They will review the plans to ensure they meet all building codes and regulations. Once approved, you will receive a permit that allows construction to begin.

After completion, we conduct a final walkthrough with you to ensure everything meets your expectations. We also provide you with all necessary documentation, including warranties, maintenance guides, and contact information for any future needs.

Cost and Financing

The cost of building a home is influenced by factors such as the size of the house, the materials used, the complexity of the design, labor costs, location, and any custom features or finishes.

The cost of building a home is influenced by factors such as the size of the house, the materials used, the complexity of the design, labor costs, location, and any custom features or finishes.

Financing options include construction loans, which cover the cost of construction and convert into a mortgage once the home is completed. We can recommend lenders who specialize in construction financing.

Land and Permits

Yes, having a plot of land is the first step. If you don’t already own land, we can assist you in finding a suitable location that meets your needs and budget.

Yes, having a plot of land is the first step. If you don’t already own land, we can assist you in finding a suitable location that meets your needs and budget.

Consider factors like location, zoning regulations, accessibility, utilities availability, soil condition, and the overall neighborhood. It’s also important to check for any restrictions or covenants on the property.

Design and Changes
Accordion Content

While it is possible to make changes, it can lead to delays and increased costs. It’s best to finalize your design before construction begins to avoid any disruptions.

Contracts and Inclusions
Accordion Content

A home build contract typically includes the scope of work, timeline, payment schedule, materials to be used, warranties, and procedures for handling changes or disputes.

Quality and Warranty

We adhere to strict quality control measures, including regular inspections, use of high-quality materials, and employing experienced tradespeople. We also keep you updated throughout the process to ensure your satisfaction.

We adhere to strict quality control measures, including regular inspections, use of high-quality materials, and employing experienced tradespeople. We also keep you updated throughout the process to ensure your satisfaction.

We offer a comprehensive warranty that covers structural elements, workmanship, and materials. Details of the warranty are provided in the contract.

Issues and Delays
Accordion Content

We strive to anticipate and mitigate potential issues before they arise. However, if unexpected delays occur, we communicate promptly with our clients and take necessary steps to minimize the impact on the project timeline.

Site Visits and Preparations

Consider factors like location, zoning regulations, accessibility, utilities availability, soil condition, and the overall neighborhood. It’s also important to check for any restrictions or covenants on the property.

Consider factors like location, zoning regulations, accessibility, utilities availability, soil condition, and the overall neighborhood. It’s also important to check for any restrictions or covenants on the property.

Yes, we encourage clients to visit the site. However, for safety reasons, visits should be scheduled and coordinated with the project manager.
Eco-Friendly Requests
Accordion Content

We offer a variety of eco-friendly building options, such as energy-efficient windows, sustainable materials, and solar power systems. We can customize the build to meet your sustainability goals.